Sentry Probe

Sentry Probe

criticalpathdesignsciences_10031440.png

SENTRY PROBE, a small, completely portable, hand held, personal RADAR device providing very reliable detection of any human movement through most walls and doors.

Expand for more details on this Product

L.E.O. - Next Generation Fighting Light System

Product From Tact-Out Industries

The ability to use light to your advantage in a fight, not just in the dark but even lit environments, has arrived. Tact-Out provides a whole new level of concealment at the speed of light. The dual purpose next generation fighting light system - the "L.E.O." - is one of the most complete fighting light system available. 

Get Info Now

C-1604 Shredder Rescue Tool Cutter

Product From POWER HAWK Technologies Inc.

POWER HAWK Technologies Inc.'s new C-1604 Shredder rescue tool cutter for motor vehicle accident emergency rescues slices through the high-strength construction materials that are used in today’s new cars and trucks. The Shredder cutter is a “plug and play” add-on to the POWER HAWK P-16 Rescue System, a patented battery-powered and gear-driven (non-hydraulic) rescue tool that provides unique interchangeable spreader and cutter attachments.

Get Info Now

Through-The-Wall (TTW) System

Product From ZISTOS CORP.

The Through-The-Wall (TTW) system was created specifically to support tactical missions and generate visual intelligence - as sensitive events are unfolding. Ideally suited for hostage/barricade scenarios, the TTW system also has value in support of breaching operations. It contains specially designed covert tools that allow observation into an adjacent interior room through a sheetrock wall. The TTW system can be applied when there are no other means available to visually assess a situation.

Get Info Now

Zeus II Forced Entry Mitten

Product From PPSS Group

UK based PPSS Group have launched what they claim is the world’s toughest forced entry mitten.

The ‘ZEUS II’ mitten are a further improved and version of the original ZEUS mitten, now also featuring a very high level of flame and heat protection.

Get Info Now

Elevated Tactic System (ETS)

Product From Patriot3 Inc.

Multi-Level structures can present significant obstacles during special operations missions. This makes ETS a valuable card in your deck of tactics.

Patriot3’s ETS are used by the most elite tactical units in the world. In addition, Patriot3’s ETS is the only ramp system on the planet to have proven itself in a combat theater having spent 4 years in Iraq employed by US and Iraqi Special Forces.

Get Info Now

Active Shooter Kit

Product From Jersey Tactical Corp.

JTC's latest JTC-Active Shooter Kit was specifically developed to be deployed by patrol effectively for response to an active shooter. This kit consists of the JTC-CLAW, Sling Kit, and Vehicle Mount. This allows patrol to grab the award winning CLAW and a rifle to go direct threat to the emergency. The 10lb CLAW was specifically invented to be used by a novice no matter what their physical capabilities are, thus allowing them to effectively use the tool to open an inward or outward opening school. Each CLAW comes with a full set of FREE instructions on how to use the tool and complete the 20 plus uses safely. Couple this with the free videos on our homepage and your officers can learn how to breach doors effectively.

Get Info Now

Master Key Dynamic Entry Tool

Product From KA-BAR Knives Inc.

KA-BAR Knives is proud to announce the release of the Master Key.

The TDI Law Enforcement Master Key enters the KA-BAR lineup in 2013 with a bang.  The dynamic entry tool is one solid 13-inch piece of 1095 cro-van steel.

Get Info Now

Liberator ETS (Elevated Tactical System)

Product From Patriot3 Inc.

The Liberator is a lightweight, hydraulically operated single ramp ETS. Its design allows the Liberator to fit a wide variety of light non-armored and armored vehicles with limited payload. The Liberator ETS will transform your vehicle in to a tactical and rescue operations unit capable of all ground operations and elevated tactics. The Liberator enables access for SWAT, Counter-Terrorism and Rescue units to a wide variety of elevated structures such as multi-story buildings, ships at dock, etc.

Get Info Now

AR-GAT (Glass Assault Tool)

Product From XS SIGHT SYSTEMS, INC.

"The GAT will allow the operator to rapidly (and effortlessly) breach glass and gain access to high-risk environments, while keeping both hands on their primary weapon platform with no effect to the weapon's zero or combat readiness." - Master Sgt. Paul Howe (ret.)

Get Info Now

Video Fiberscope with Working Channels

Product From Tactical Electronics

The Video Fiberscope with Working Channels combines the use of three EOD specific tools with the Video Fiberscope. A tripod grasper tool, alligator grasper tool, or wire cutter tool can be inserted and controlled from the base of the unit’s flexible neck. The tools exit out the distal end of the probe for in-package manipulation while the camera simultaneously captures all activity inside the package. Utilizing these three tools with a camera allows EOD operators to gain visual access into a package while manipulating the content from one entry hole.

Get Info Now